Skip to content
Digital Hub

Platforms - Odoo Manufacturing

Production data captured where the work happens.

Odoo Manufacturing gives Australian makers BOMs, routings, work orders, subcontracting and true production costing in the same system as finance and inventory. We sequence it deliberately - BOM and stock accuracy first, floor capture second, costing and scheduling once the data can be trusted.

At a glance

Who this suits
Make-to-order, make-to-stock and assembly operations with repeatable product families.
First milestone
Accurate BOMs and inventory - everything else depends on them.
Outcome
Production cost, capacity and traceability visible during the job, not after invoicing.

Capability

What we implement in Odoo MRP.

  • Bills of materials that reflect the build

    Multi-level BOMs with variants, phantom assemblies, by-products and scrap allowances matching what is actually consumed on the floor.

  • Routings and work centres

    Operations, work centre capacity, setup and run times, so scheduling reflects real constraints rather than optimistic assumptions.

  • Work orders and shop-floor capture

    Tablet or barcode capture of start, finish, quantity produced and scrap - recorded as it happens rather than reconstructed later.

  • Material planning

    Replenishment rules, lead times and manufacturing orders driven from demand, so shortages are visible before the job is scheduled.

  • Subcontracting

    External operations tracked with material issued, expected return and cost captured against the production order.

  • Quality and traceability

    Quality checkpoints in the routing, plus lot and serial traceability from raw material through to the customer delivery.

Sequence

The order that makes manufacturing stick.

  1. 01

    Get the BOMs right

    Accurate, maintained bills of materials are the precondition. Without them, nothing downstream can be trusted.

  2. 02

    Stabilise inventory

    Accurate on-hand quantities and locations before production consumes from them.

  3. 03

    Model routings

    Work centres, operations and realistic times, starting simple and adding detail once capture is habitual.

  4. 04

    Introduce floor capture

    Work order confirmation at the point of work, with an interface an operator can use in gloves.

  5. 05

    Turn on costing

    Real material, labour and overhead against production orders once the capture data is reliable.

  6. 06

    Plan and schedule

    Only once capacity and time data reflect reality is scheduling worth acting on.

Readiness

An honest readiness check.

Ready for MRP

Preconditions met

  • Products and BOMs documented and owned
  • Stock counts broadly accurate
  • A defined production process per product family
  • Floor supervision willing to capture at source
  • Someone accountable for master data upkeep

Not ready yet

Fix these first

  • BOMs living in people's heads
  • Stock accuracy unknown or poor
  • Every job effectively bespoke and undocumented
  • No devices or connectivity on the floor
  • Production planning done entirely in spreadsheets nobody will surrender

Straight talk

Three things manufacturers should hear first.

  1. 01MRP is a data discipline, not a module

    The software is capable. The result depends entirely on whether BOMs, routings and stock are maintained by someone whose job it is.

  2. 02Start simpler than you think

    One-step manufacturing with basic routings, adopted properly, beats a detailed model that the floor stops updating within a month.

  3. 03Costing accuracy follows capture accuracy

    Production costing only becomes meaningful once operators confirm work reliably. Expect a period of parallel checking before you rely on the numbers.

Bringing production into your ERP?

We will assess BOM and inventory readiness first, then tell you what a realistic phase one looks like.